Associated Records

Image of 2008.50.10 -

2008.50.10 -

A map of the Algonquin Pipeline Project Phase III (3), which was created by Maritimes & Northeast Pipeline, L.L.C. The map is an alighnment sheet. The the pipeline would run from Crane Brook to Norris Brook. The property lines on the map are based on existing mapping and taxmaps. The compilation performed by Coler & Colantonio, Inc. of Norwell MA in the winter of 2000. The wetland delineation was conducted by Earth Tech in the fall of 2000 and spring of 2000 and the date of orthophotography was in May of 1999. The drafting designer; drafting supervisor; design engineer and project manager all signed off on the map on August 25, 2000. The W.O. # 270001 DWG: BB-A-1021

Image of 2008.50.8 -

2008.50.8 -

A map of the Algonquin Pipeline Project Phase III (3), which was created by Maritimes & Northeast Pipeline, L.L.C. The map is an alighnment sheet. The the pipeline would run down Andover Street (Route 114) in Peabody to Collins Street, Danvers. The property lines on the map are based on existing mapping and taxmaps. The compilation performed by Coler & Colantonio, Inc. of Norwell MA in the winter of 2000. The wetland delineation was conducted by Earth Tech in the fall of 2000 and spring of 2000 and the date of orthophotography was in May of 1999. The drafting designer; drafting supervisor; design engineer and project manager all signed off on the map on August 25, 2000. The W.O. # 2

Image of 2008.50.9 -

2008.50.9 -

A map of the Algonquin Pipeline Project Phase III (3), which was created by Maritimes & Northeast Pipeline, L.L.C. The map is an alighnment sheet. The the pipeline would run down Maritimes & Northeast Pipeline Phase III, Alignment Sheet goes from Endicott Street in Danvers to Waters River. The property lines on the map are based on existing mapping and taxmaps. The compilation performed by Coler & Colantonio, Inc. of Norwell MA in the winter of 2000. The wetland delineation was conducted by Earth Tech in the fall of 2000 and spring of 2000 and the date of orthophotography was in May of 1999. The drafting designer; drafting supervisor; design engineer and project manager all signed off